Other Projects  >>

Procurement of 2nos Firewater Pumps/Jockey for Obodo Flowstation Installation & Commissioning

Client

DGS Integrated Projects Limited

Location

Obodo, Delta State

Completion

August, 2025

Details

DGS Integrated Projects Limited issued a subcontract award to RADNOR for the supply contract of two (2) Bristol Firewater Pumps/Jockey for the Obodo Flowstation Installation and Commissioning Project at OML 150. Conoil Producing Limited is the Client.

Scope

  • Factory Acceptance Test (FAT).
  • Provision of on-the-job training for Client Personnel on the supplied equipment, and Vendors’ works.
  • Shipment to Nigeria, clearing through port and customs, inland transportation, storage and delivery of Equipment to Obodo, Delta State. to NGC.
Radnor Energy Limited © 2025
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram