Other Projects  >>

Contract for Supply of Compact 2 – Loop Addressable Fire Alarm Panel for 90 MMSFD Sapele Gas Plant.

Client

DGS Integrated Projects Limited (Seplat Petroleum Development Company)

Location

Sapele, Delta

Completion

August, 2025

Details

RADNOR supplied DGS Integrated Projects Limited with 4nosof Vigilon Compact 2 - Loop Addressable Fire Alarm Panels for Nigeria’s Gas Company (NGC) Engineering Design, Procurement, Construction, Installation, Testing and Commissioning of Gas Compressors at the NGC’s Sapele facility.

Scope

  • Factory Acceptance Test (FAT).
  • Provision of on-the-job training for Client Personnel on the supplied equipment, and Vendors’ works.
  • Shipment to Nigeria, clearing through port and customs, inland transportation, storage and delivery of Equipment to Obodo, Delta State. to NGC.
Radnor Energy Limited © 2025
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram